Westinghouse Nuclear Fuel Proven Results Videos

The Westinghouse Electric Company’s division for nuclear power generation is the largest nuclear fuel and fuel rod assembly provider. WEC NF has implemented GSQA to manage quality and material validation across their multi-level supply chain for fuel rod bundle fabrication. The unique and industry-leading project provides real-time access to successively deeper tiers in their product fabrication supply chain with metal treatment, part fabrication, assembly creation testing at each level in support of WEC NF quality-assurance goals and a final customer-delivered report composed of each tier's material/spec/QC-tests for compliance and traceability. GSQA was selected for its capability to model complex supply chains for material validation with e-COA®, its web-based nonconformance management, and supply-chain-member certification and regulatory compliance, all via a single SaaS solution.

An industry unique use-case is the requirement for on-going certification of design drawings, test methods, and other version-specific documents along with test results for each lot of each material at each tier in the supply chain.

The presentation links below are chapters from an overall presentation provided by Ms. Tina Rankin, WEC NF project manager, to the ASQ Energy and Environmental Division at their annual conference in 2011. The video chapters are in sequential order of Ms. Rankin’s presentation, but please feel free to select individual chapters by topic/link.


Supply Chain Overview

WEC NF overview and project background.

Supply Chain Overview


Supply Chain Upstream

Supply base quality assurance opportunities beyond periodic audits.

Supply Chain Upstream


Not-Alone

Problem is not unique to the Nuclear Fuel industry, and the solution was found outside the industry.

Not-Alone


Supply Chain Downstream

Looking toward customers and their need of detailed as-built supply chain bill of material.

Supply Chain Downstream


Solution Analysis and Plan

No incremental change, WEC NF needed to innovate.

Solution Analysis and Plan


Business Case

End-to-end solution provided the business case for the project.

Business Case


Track and Trace

Complete picture of supply chain from suppliers to/through WEC NF plants to customers.

Track and Trace


Certifications Management

Appropriate and correct info provided by part number from the right supplier, not all the same data.

Certifications Management


Ease-of-Use

Suppliers find GSQA extremely easy to use.

Ease-of-Use


Revision Management

Systematic validation accomplished for drawing, test plans, process docs, etc. by correct revision.

Revision Management


Output: End of Manufacturing Report

As-built bill of material for the full supply chain by final material part.

Output: End of Manufacturing Report


Export to SAP - 2 Sites

Option to output as-built BOM to ERP like SAP.

Export to SAP - 2 Sites


Ten Points of GSQA Control

Here’s what has been done, and what is interesting to tackle in the future.

Ten Points of GSQA Control